Metalum Tube Factory

Topkapı / Istanbul 2003

Project Information:

The lack of capacity of the factory brought the need to build a new one. Office space is designed in in front and production space is designed in the back of the building. Frontage office part is covered with granite and glass, production space is covered with sadwich panel.

Finished

Under Construstion

Render

Drawing